Sign In | Join Free | My xpandrally.com
China Zhangjiagang HuaDong Boiler Co., Ltd. logo
Zhangjiagang HuaDong Boiler Co., Ltd.
Zhangjiagang HuaDong Boiler Co., Ltd.
Verified Supplier

9 Years

Home > Boiler Fin Tube >

Hi Frequency Welding Industrial Boiler Fin Tube For Power Plant ASME Standard

Zhangjiagang HuaDong Boiler Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Hi Frequency Welding Industrial Boiler Fin Tube For Power Plant ASME Standard

Brand Name : HD BOILER

Model Number : Spiral/H TYPE

Certification : ISO9001 , SGS , TUV , ASME , EN

Place of Origin : China

MOQ : 1 set

Price : Negotiable

Payment Terms : Western Union

Supply Ability : 1200 Tons Per Month

Delivery Time : 50 Days

Packaging Details : Iron Frame Packing

Standard : ASME

Material : Stainless Steel / ND Steel / Carbon Steel / Alloy Steel

Bare Tube : Cold Finished

Welding : High Frequency welding

Type : Boiler part

Specification : Customized

Contact Now

High Frequency Welding Fin Tube For Power Plant Industrial Boiler ASME Standard

Introduction

  • 1. Economiser performs a key function in providing high overall boiler thermal efficiency by recovering the low level energy from the flue gas before it is exhausted to the atmosphere.

  • 2. Economiser recovers the energy by heating the boiler feedwater.

  • 3. Economiser are basically tubular heat transfer surfaces used to preheat boiler feed water before it enters the steam drum or furnace surfaces.

  • 4. Economiser reduces operating costs or economise on fuel by recovering extra energy from the flue gas.

  • 5. Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn't exceed the boiling purpose of liquid.

  • 6. We can manufacture three types of boiler economizer, bare tube economzier, H finned tube economzier and spiral finned tube economzier.

Procedure

1 Economisers also reduce the potential of thermal shock and strong water temperature fluctuations as the feed water enters the drum or waterwalls.
2 Increasingly stringent environmental regulations limiting nitrogen oxides and sulfur dioxide emission can also affect economizer design.
3 The gas-side heat transfer coefficient is much less than water side heat transfer coefficient. To compensate this, outer surface of the tubes may be finned to increase the surface area of heat transfer.
4 The ultimate goal of economizer design is to achieve the necessary heat transfer at minimum cost.
5 A key design criterion for economizer is maximum allowable flue gas velocity. Higher velocity provide better heat transfer and reduce capital cost.

Specifications

Name(unit) Specification(mm)
Bare pipe(OD) 25-1650
Bare pipe(Thickness) 2-40
Fin (Thickness) 0.6-3.0
Fin (Height) 5-30
Fin tube thread pitch 5-30
Fin tube length ≤12000

Material:Carbon Steel,Alloy,Austenitic Steel(Nickel and Chromium or Manganese)

Quality Control

1 Impact test and Strength calculation report with applied materials information.
2 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.
3 X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler.
4 Hydraulic test report: ensure the standard working pressure and safety.

Hi Frequency Welding Industrial Boiler Fin Tube For Power Plant ASME Standard

Company Introduction


For over 30years, Hua Dong Boiler has been consistently innovating and improving our boiler superheaters and reheaters.The improvements in bending,welding and design ensure our products meet both Euorpean and American standards, ensuring a relabile performance..


Product Tags:

spiral fin tube

      

heat exchanger fin tube

      
Wholesale Hi Frequency Welding Industrial Boiler Fin Tube For Power Plant ASME Standard from china suppliers

Hi Frequency Welding Industrial Boiler Fin Tube For Power Plant ASME Standard Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhangjiagang HuaDong Boiler Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)